Album: 312 23rd Street: Post-sale, pre-demolition
Quickie tour of the house pre-demo.
Date: 07/27/2007
Size: 14 items
Views: 172
|
Album: Asbestos Removal: August 12-15, 2007
Asbestos shingles and roofing had to go before demo could begin.
Date: 08/12/2007
Size: 13 items
Views: 145
|
Album: Work done by us at Chez 311 23rd Street (like it or not)
Any and all work we have to do at our little abode due to the work at 312 23rd Street.
Date: 03/09/2008
Size: 2 items
(27 items total)
Views: 70
|
|
Album: All the demo and undperpinning you can shake a stick at: December 26, 2007-March 12, 2008
After MUCH demo, undeprinnig and waterproofing, we have gathered all the galleries here for your viewing pleasure.
Date: 12/26/2007
Size: 14 items
(218 items total)
Views: 96
|
Album: Excavation and Foundation Work: March 20, 2008 to May 27, 2008
Excavation starts in prep for the new "build up" of the foundation for 312 23rd Street. Then, foundation galore.
Date: 03/20/2008
Size: 16 items
(190 items total)
Views: 57
|
Album: Chez 311 "Crack & Water" Gallery
All those inevitable cracks, bumps, dings, dongs and unfortunate floods that are bound to happen during construction.
Date: 05/22/2008
Size: 2 items
(28 items total)
Views: 33
|
|
Album: Brick, Block and Steel Work Begins: June 2, 2008 until ???
Now that the foundation is in place, in come our freindly masons from Alex Masonry. the hear working team should have the 4 floors up in no time.
Date: 06/02/2008
Size: 8 items
(135 items total)
Views: 13
Updated
|
|
|