312 23rd Street-Brooklyn NY-"Tear Down & Build Up"
Advanced Search
RSS Feed for this Album View Slideshow

Random Image

IMG_2364

IMG_2364

Date: 05/21/2008 Views: 0

312 23rd Street-Brooklyn NY-"Tear Down & Build Up"

In July of 2007, our neighbor at 312 23rd Street, Brooklyn, NY sold his circa 1900's wood frame 2 story home to a local developer. In a nutshell, tear down the old, build up with the new. Here's to a slightly biased documentation of the demolition of the "old" 312 23rd Street and construction of the "new" 312 23rd Street condos. Camera ready! Let's start shooting.

Not all photos will get captions, but where and when necessary, we'll add our 2 cents to the caption.

Please feel free to comment where you see fit, though we reserve the right to edit.

NOTE: if you use the "slide show" option (which is great), make sure to set the size to "640X640" or "800X800" to avoid those tiny shots :)

FYI, the "lot line" window shots will continue (those lovely overhead, looksie down images) as long as we have the window...which will be entombed at some point during the building of the "new" 312 23rd St. From there? I guess move to the roof :(

AND, have your own photos of this site? Send them to us, and we'll add them here. E-mail them to 31223rdst(at)ccgreenwoodhts.com and we'll add them to the site (pending approval).

And as always, if you see something fishy at 312, CALL 311, take a snapshot and let us know asap. We hope this new development site's documentation will be a treasure to remember and not an bad-boy to forget. So far so good (to be updated...)

More info on the community of Greenwood Heights and the CCGH at www.ccgreenwoodhts.com

>Recently featured on The Gowanus Lounge and Brownstoner 12/31/07

>New Mechanical Demo on YouTube from January 16, 2008. And more from January 23, 2007 here (mech demo pt. 1) and here (mech demo pt. 2).

Date: 12/31/2007
Size: 7 items (632 items total)
312 23rd Street: Post-sale, pre-demolition

Album: 312 23rd Street: Post-sale, pre-demolition

Quickie tour of the house pre-demo.

Date: 07/27/2007
Size: 14 items
Views: 172
Asbestos Removal: August 12-15, 2007

Album: Asbestos Removal: August 12-15, 2007

Asbestos shingles and roofing had to go before demo could begin.

Date: 08/12/2007
Size: 13 items
Views: 145
Work done by us at Chez 311 23rd Street (like it or not)

Album: Work done by us at Chez 311 23rd Street (like it or not)

Any and all work we have to do at our little abode due to the work at 312 23rd Street.

Date: 03/09/2008
Size: 2 items (27 items total)
Views: 70
All the demo and undperpinning you can shake a stick at: December 26, 2007-March 12, 2008

Album: All the demo and undperpinning you can shake a stick at: December 26, 2007-March 12, 2008

After MUCH demo, undeprinnig and waterproofing, we have gathered all the galleries here for your viewing pleasure.

Date: 12/26/2007
Size: 14 items (218 items total)
Views: 96
Excavation and Foundation Work: March 20, 2008 to May 27, 2008

Album: Excavation and Foundation Work: March 20, 2008 to May 27, 2008

Excavation starts in prep for the new "build up" of the foundation for 312 23rd Street. Then, foundation galore.

Date: 03/20/2008
Size: 16 items (190 items total)
Views: 57
Chez 311 "Crack & Water" Gallery

Album: Chez 311 "Crack & Water" Gallery

All those inevitable cracks, bumps, dings, dongs and unfortunate floods that are bound to happen during construction.

Date: 05/22/2008
Size: 2 items (28 items total)
Views: 33
Brick, Block and Steel Work Begins: June 2, 2008 until ???

Album: Brick, Block and Steel Work Begins: June 2, 2008 until ???

Now that the foundation is in place, in come our freindly masons from Alex Masonry. the hear working team should have the 4 floors up in no time.

Date: 06/02/2008
Size: 8 items (135 items total)
Views: 13