312 23rd Street-Brooklyn NY-"Tear Down & Build Up" Brick, Block and Steel Work Begins: June 2, 2008 until ??? Brick and Block Days 07-09: June 17-June 19, 2008
Advanced Search
RSS Feed for this Album View Slideshow

Brick, Block and Steel Work Begins: June 2, 2008 until ???

1. The Masons ... 2. The First... 3. Brick and... 4. Brick and... 5. Brick and... 6. Brick and... 7. Day 15's... 8. Brick and...

Random Image

IMG_2928

IMG_2928

Date: 06/13/2008 Views: 7

Brick and Block Days 07-09: June 17-June 19, 2008

Well, back to work for Alex's crew after the floor dried. The next 3 days saw much brick and block work along with an excellent flashing job (roof flashing that is) to our metal roof. Another milestone was the crew reaching the back 2nd story windows. What to do? They have to be entombed by law. Could be bricked in, but those windows are fire-grade. Could just block on top of them, but Alex feels green board (insulation) should be fitting in front of the windows, then continue with the blocking.

Only one thing...the surprise of the renter, returning home from being away to find her windows gone! (did we mention the real estate broker failed to mention the windows going bye bye?).

Date: 06/17/2008
Size: 13 items
nextlast
IMG_2957

IMG_2957

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 15
IMG_2958

IMG_2958

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 21
IMG_2959

IMG_2959

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 12
IMG_2962

IMG_2962

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 12
IMG_2963

IMG_2963

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 16
IMG_2964

IMG_2964

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 16
IMG_2965

IMG_2965

Day 7 brings another load of block and brick and the crew makes it over the first floor threshold.

Date: 06/17/2008
Owner: CCGH Gallery Admin
Views: 13
IMG_2984

IMG_2984

Days 8 and 9 have the crew reaching the first of 313 23rd Street's 2nd story windows, which unfortunately have to go.

Date: 06/18/2008
Owner: CCGH Gallery Admin
Views: 13
IMG_2985

IMG_2985

Days 8 and 9 have the crew reaching the first of 313 23rd Street's 2nd story windows, which unfortunately have to go.

Date: 06/18/2008
Owner: CCGH Gallery Admin
Views: 18
nextlast